Crude Oil Storage Tank A (T-1101A)
Oil Terminal Crude Oil Storage Tank
Oil and Gas
Eliminates confined space entry and the requirement for Emergency Response Team or Tank Sentry
x1 UAV team (Pilot), X2 days inspection vs X2 inspections / RA team, x1 Tank Sentry, ERT Team, 6-8 days inspection.
General Visual Inspection (GVI) and Close Visual Inspection (CVI) of internal crude oil storage tank within onshore oil and gas terminal. The purpose of the inspection is to ascertain the condition of the internal structure of the tank to aide decommissioning planning and enactment.
Air Control Entech deployed an ACE-A-E2 internal inspection UAV to conduct the inspection without the need for man entry. By flying from outside the tank, the team were able to eliminate man entry whilst producing valuable inspection data of the tank internals.
Full high-definition videography and photography data was captured and compiled into a report for the operator.
Conventional Access | Air Control Entech |
---|---|
We're sorry...
Our website has detected that you are using an out of date or unsupported web browser
(Internet Explorer).
Please use a modern browser to access our site and revisit us once you have upgraded, thank you.